Chongqing Gold Mechanical & Electrical Equipment Co.,Ltd
Chongqing Gold Mechanical & Electrical Equipment Co.,Ltd
GDTS-202 Hydraulic Turbine Speed Governor price
  • GDTS-202 Hydraulic Turbine Speed Governor price
GDTS-202 Hydraulic Turbine Speed Governor price

GDTS-202 Hydraulic Turbine Speed Governor price

Min. Order:
1
Min. Order:
1
Delivery Time:
15 Days
Quantity:

Your message must be between 20 to 2000 characters

Contact Now
Basic Info
Basic Info
Place of Origin: Chongqing
Supply Ability: 300
Certificate: ISO
Product Description
Product Description

GDTS-202 Simulation tester for hydraulic turbine governing system

 

 

I Introduction

 

GDTS202 is a special instrument for water turbine governor system tests. It was designed by Chongqing Gold 

Mechanical&Electrical Equipment Co., Ltd. The main function of the tester include Governor runaway 

speed waggling test, Governor Noload disturbing test, Dead time measurement, Turbine Load rejection test, Governor static 

characteristic test, Turbine simulation, Turbine load disturbing test, Primary frequency 

regulation test and so on. All the tests would be complete automatic according to national standards of 

water turbine governor. The test results would be shown as parameters value and curves in PC application. 

Also all the results could be convert to MS WORD test reports.

 

GDTS202 is also a data acquisition and scope instruments. The maximum sample rate of the test could be 

reach 4kHz.The are 6 sample channels integrated in the tester. This function would help customer to complete 

a lot of other tests in hydropower station.

 

The simulation module of GDTS202 has integrated 5 different water turbine models. It would help governor

 manufacturer to make tests without real turbine environment. It is valued for manufacturers to debug and make

 factory reports of new governor.

 

II Main Parameter

 

Model GDTS-202 Simulation tester for hydraulic turbine governing system
Power Output Range 10V~10V
Current Input Range 20mA~20mA
Error of Full Range <0.2%

 

 

III Packing&Delivery

 

Payment & Shipping Terms

Supply Capacity

Payment term :

T/T or L/C

Production capacity :

500pcs/month

MOQ:

1 pc

Packing :

 Wooden case

Price

negotiable

Delivery way

 By Air

Means of transport :

FOB , CIF , CFR

Delivery time :

10 days

 

IV Trade Show

.jpg

Send your message to this supplier

  • Ms. sunny

  • Enter between 20 to 4,000 characters.