Chongqing Gold Mechanical & electrical Equipment Co..Ltd
Chongqing Gold Mechanical & electrical Equipment Co..Ltd
Borehole Camera and Downhole Vedio Camera hardpan inspecting camera
  • Borehole Camera and Downhole Vedio Camera hardpan inspecting camera
Borehole Camera and Downhole Vedio Camera hardpan inspecting camera

Borehole Camera and Downhole Vedio Camera hardpan inspecting camera

Payment Type:
T/T, L/C, D/A, D/P, Western Union
Min. Order:
1 Set/Sets
Min. Order:
1 Set/Sets
Delivery Time:
10 Days
Transportation:
Land, Air
Quantity:

Your message must be between 20 to 2000 characters

Contact Now
Basic Info
Basic Info
Place of Origin: china
Productivity: 50 set/m
Payment Type: T/T,L/C,D/A,D/P,Western Union
Transportation: Land,Air
Product Description
Product Description

Factory supply  500meter rotary well  camera

 

 performance and technical index:

 

The instrument is light weight, convenient carrying, simple operation, voltage 220V, 380V switch, highly integrated, 

probe obtained national patent technology, the ultra wide angle lens, underground, wall, a full range of stick 

out a mile, realize panoramic display, the resolution can reach 0.1mm, using LED strong light, high resolution images,

 the main control box can be connected with computer digital acquisition and storage, cable probe and the control box 

can be separated, suitable for complicated objects and environment.

 

The main technical indicators:

 

(1) the probe diameter: diameter of 80mm;

(2) the observation angle: directional overlooking the wide angle

(3): LED light source color temperature of light source, 4000K

(4) lens automatic focusing, observation distance: 10cm - 5m (as the waters of the environment)

(5) the probe: color illumination industrial grade miniature camera, the horizontal resolution of 850 lines, 1\/3 SONY CCD

 

 

 

 

The actual operation method:

 

The 1 connecting cable connection control box and cable rack.

 

2 of the power line is inserted into the 220V socket.

 

3 switch on the power, 220V, 380V switch to 220V position. (if you use the 380V power supply, converting switch to 380V side).

 

4 press the green power switch, probe began to work.

 

5 pulleys placed wellhead wellhead, reset the counter.

 

6 of the cable along the pulley to decentralization initiated work well.

 

Send your message to this supplier

  • Ms. LIZ

  • Enter between 20 to 4,000 characters.

Related Keywords

Related Keywords