Gdkc-2000 Transformer Load Voltage Adjustment Switch Tester
  • Gdkc-2000 Transformer Load Voltage Adjustment Switch Tester
Gdkc-2000 Transformer Load Voltage Adjustment Switch Tester

Gdkc-2000 Transformer Load Voltage Adjustment Switch Tester

Payment Type:
L/C, T/T, D/P
Quantity:

Your message must be between 20 to 2000 characters

Contact Now
Basic Info
Basic Info
Place of Origin: Chongqing
Payment Type: L/C, T/T, D/P
Product Description
Product Description
GDKC-2000 Transformer Load Voltage Adjustment Switch Tester
1.1 transformer switch General introduction
The tester can record transformer switch operation waveform in overall process. The longest time is 6.4s.
It can test various parameters such as transition waveform, transition time, transition resistance and three phase synchronization one time and analyze results automatically. It has power-off protection, over-voltage protection, perpetual clock and high-speed printing.
1.2 transformer switch Technique index
1. Three way independent test power, the maximum output current is 0.5A.
2. Processing part: 80C320 high speed 8 digit microprocessor High speed A/D converter, the 3. Maximum sampling rate can reach 400KHz
4. Tester set sampling rate: 10~20KHz
5. Maximum save time of single waveform: 6.4s
6. Transition resistance measuring scope: 0~40Ω
7. Measuring precision: 10%
8. Power supply: 220V± 10% power: 200W
9. Size: 410*320*260mm3
10. Weight: 20kg