Chongqing Gold Mechanical & Electrical Equipment Co., Ltd.
Chongqing Gold Mechanical & Electrical Equipment Co., Ltd.
Transformer Load Voltage Adjustment Switch Tester, Oltc Tester
  • Transformer Load Voltage Adjustment Switch Tester, Oltc Tester
Transformer Load Voltage Adjustment Switch Tester, Oltc Tester

Transformer Load Voltage Adjustment Switch Tester, Oltc Tester

Payment Type:
L/C, T/T, Paypal, Western Union, Cash
Quantity:

Your message must be between 20 to 2000 characters

Contact Now
Basic Info
Basic Info
Place of Origin: Chongqing, China
Payment Type: L/C, T/T, Paypal, Western Union, Cash
Product Description
Product Description
General Summary:
V The tester can record switch operation waveform in overall process.
V The longest time is 4s.
V It can test various parameters such as transition waveform, transition time, transition resistance and three phase synchronization one time and analyze results automatically.
V It has power-off protection, over-voltage protection, perpetual clock and high-speed printing.
Technique index:
V Three way independent test power, the maximum output current is 0.5A.
V Processing part: 80C320 high speed 8 digit microprocessor High speed A/D converter, the Maximum sampling rate can reach 400KHz
V Tester set sampling rate: 10~20KHz
V Maximum save time of single waveform: 4s
V Transition resistance measuring scope: 0~40Ω
V Measuring precision: <=10%
V Power supply: 220V± 10% power: 200W
V Size: 410*320*260mm3
V Weight: 20kg

Send your message to this supplier

  • Ms. Ivy Zhang

  • Enter between 20 to 4,000 characters.

Related Keywords

Related Keywords