
Burning Furnace Method Asphalt Content Tester
- Payment Type:
- L/C, T/T, Paypal, Western Union
Quantity:
Your message must be between 20 to 2000 characters
Contact NowBasic Info
Basic Info
Place of Origin: | Chongqing, China |
---|---|
Payment Type: | L/C, T/T, Paypal, Western Union |
Product Description
Product Description
1. Asphalt Content Tester ASTM D6307 standard;
2. Combustion methods;
3. Max. Sample: 2kg;
4. Easy operation;
5. Low price;
GD-6307 Asphalt Content Tester
Introduction:
The instrument is designed and made as per ASTM D6307/98, AASHTO IP53-95, and BS DD250. It is used to determine asphalt content by combustion methods. It is environment friendly, safe, accurate, and rapid.
Specifications:
V Maximum sample weight: 2000 g;
V Recommended weight: 1000~1500 g;
V Balance accuracy: ± 0.1g;
V Full scale of balance: 10 kg;
V Size of combustion chamber: 350× 440× 330mm;
V Maximum working temperature of combustion chamber: 800 Centigrade;
V Standard working temperature of combustion chamber: 538 Centigrade;
V Measurement accuracy: Automatic end point determination; Measurement accuracy for asphalt content can be 0.10%;
V Test time: 20~30 minutes;
Power supply: 380V± 5% three phases (Star shape); The electric current is not more than 20 A;
2. Combustion methods;
3. Max. Sample: 2kg;
4. Easy operation;
5. Low price;
GD-6307 Asphalt Content Tester
Introduction:
The instrument is designed and made as per ASTM D6307/98, AASHTO IP53-95, and BS DD250. It is used to determine asphalt content by combustion methods. It is environment friendly, safe, accurate, and rapid.
Specifications:
V Maximum sample weight: 2000 g;
V Recommended weight: 1000~1500 g;
V Balance accuracy: ± 0.1g;
V Full scale of balance: 10 kg;
V Size of combustion chamber: 350× 440× 330mm;
V Maximum working temperature of combustion chamber: 800 Centigrade;
V Standard working temperature of combustion chamber: 538 Centigrade;
V Measurement accuracy: Automatic end point determination; Measurement accuracy for asphalt content can be 0.10%;
V Test time: 20~30 minutes;
Power supply: 380V± 5% three phases (Star shape); The electric current is not more than 20 A;
Related Keywords
Related Keywords
You May Also Like
You May Also Like