Chongqing Gold Mechanical & Electrical Equipment Co,. Ltd
Chongqing Gold Mechanical & Electrical Equipment Co,. Ltd
water well drilling rig drilling machine XY-2BL
  • water well drilling rig drilling machine XY-2BL
water well drilling rig drilling machine XY-2BL

water well drilling rig drilling machine XY-2BL

Incoterm:
EXW
Min. Order:
1 Set/Sets
Min. Order:
1 Set/Sets
Delivery Time:
15 Days
Transportation:
Ocean
Quantity:

Your message must be between 20 to 2000 characters

Contact Now
Basic Info
Basic Info
Place of Origin: China
Productivity: 100 sets per week
Supply Ability: 100 sets per week
Incoterm: EXW
Certificate: CE, ISO9001
Transportation: Ocean
Product Description
Product Description


Application&Features

XY-2BL rig is a mobile drilling rig developed based on our XY-2 core drilling rig , integrating drilling rig, crawler, mud pump, console rack and other devices into the integral one. It is mainly targeted at the shallow-medium hole of geology core drilling, and where the mobility is important. It is modular and integral drilling rig.

Features:

Integrated crawler, rig, mud pump, console racks;
Crawler, the whole support rigs and tower with ups and downs are controlled by the hydraulic system of the rig, easy to operate and transport;
The whole set of equipment can move to relocate, improve drilling efficiency, reduce labor intensity;
The tower has the function of ups and downs , folding , easy walking and transportation;
Rig with more (8 block) the speed of progression and reasonable speed range, and the relatively large low-speed torque, wide range of application.
Rig has two reverse gear speeds, easy to deal with incidents;
Rig has longer feed stroke as long as 600mm, will help improve drilling efficiency and reduce blocking drill, burning accidents;
Rig has double oil pump, less power consumption, lower oil temperature of hydraulic system;
Rig has few control levers, rational layout, flexible and reliable operation;
In addition there is a normally closed upper hydraulic chuck on , but also with lower mechanical man-powered chuck.

Specifaction


1 Drilling depth (NQ drill rod) Approximately 500m
2 Spindle speed Forward 57; 99; 157; 217; 270; 470; 742; 1024
Reverse 45; 212 r/min
3 Spindle Maximum torque 3200 N·m
4 Spindle max pulling force 60 KN
5 Spindle stroke 600 mm
6 Max. lifting force of the hoist with single rope 30 KN
7 Inner diameter of the spindle 96 mm
8 Retraction distance 305 mm
9 Retraction distance for the host drill rig 330 mm
10 Retraction distance for both drill rig and tower 160 mm
11 Oil pump SCB32/12 double gear pump
12 Power unit engine power 30 KW 1500 r/min
electric motor 22 KW 1470 r/min
13 Crawler maximum walking speed 1.2 km/h
14 Crawler Climbing capacity no more than 25 °
15 Tracked Ground pressure 0.042 MPa
16 Rig height 8 m
17 Hook load of the tower 29.4 kN
18 Max.static load of crown block beam 58.8 kN
19 Quantity of pulley 2
20 Angle range of tower ups and downs 0°~ 90°
21 Rig Dimensions ( tower horizontal position ) (L*W*H) 4450×2166×3080 mm
22 Total weight 5500 kg




Send your message to this supplier

  • Mr. Alvin Qin

  • Enter between 20 to 4,000 characters.