Chongqing Gathering Marine Equipment co., Ltd.
Chongqing Gathering Marine Equipment co., Ltd.
Marine Sewage Treatment Plant
  • Marine Sewage Treatment Plant
  • Marine Sewage Treatment Plant
  • Marine Sewage Treatment Plant
  • Marine Sewage Treatment Plant
  • Marine Sewage Treatment Plant
Marine Sewage Treatment Plant
Marine Sewage Treatment Plant
Marine Sewage Treatment Plant
Marine Sewage Treatment Plant
Marine Sewage Treatment Plant

Marine Sewage Treatment Plant

  • USD1000
    ≥1 Bag/Bags
Payment Type:
L/C, T/T, Paypal, Western Union
Incoterm:
FOB, CFR, CIF, FCA, CPT, CIP
Min. Order:
1 Bag/Bags
Min. Order:
1 Bag/Bags
Delivery Time:
15 Days
Transportation:
Ocean, Land, Air
Quantity:

Your message must be between 20 to 2000 characters

Contact Now
Basic Info
Basic Info
Place of Origin: Chongqing,China
Productivity: 1000set/month
Supply Ability: 1000 sets/month
Payment Type: L/C,T/T,Paypal,Western Union
Incoterm: FOB,CFR,CIF,FCA,CPT,CIP
Certificate: CCS,EC
Transportation: Ocean,Land,Air
Product Description
Product Description
Marine Sewage Treatment Plant Manufacturer
Specification:
1. Adopting horizontal circular design, ellipse closures on both ends, pressure resistance and compact structure.
2. The device is adopted auto-control, and compliance with the requirement of 24-hours unattended cabin.
3. Adopting the "MBR" technology, devices allow to the narrow size, and solve the conflict of small space of cabin, but big volume of device.
4. The intermittent aeration in bio-membrane tank and hollow fiber membrane tank, form the process of "aerobic anoxic", and resolve the problem of "nitrogen and phosphorus removal".
5. The device is adopting the principle of "air-lifting" to transfer the sludge from sediment tank and membrane tank to aeration tank, meantimes the "pump stops and air never stopped", so as the scale on the membrane surface comes down. Due to back flushing and clean the membrane "online" usd technology patent.
6. "On-line" cleaning technology, making the dirt on membrane off automatically, recover membrane flux. It can be solved the problem of opening the cleaning or replacement of membrane difficultly caused by the small space in cabin.
7. The effluent after further treatment can be reached at the requirement of "water recovery".
Meet the lastest standard MEPC.227(64) 
Model list (15 persons _400 persons ) 

                                                                                                       SWCM
10 persons  15 persons  20 persons  25 persons  30 persons  40 persons  50 persons  60 persons  80 persons  100 persons  120 persons  150 persons  200 250 300 400
Treated Load Average Load (L/d) 840 1190 1540 1890 2310 3080 3780 4480 6020 7700 9100 11200 14700 18200 23100 30800

Peak Load  (L/h) 105 149 193 237 289 385 473 560 753 963 1138 1400 1838 2275 2888 3850

Organic Load  (kgBOD5/d) 0.42 0.595 0.77 0.945 1.155 1.54 1.89 2.24 3.01 3.85 4.55 5.6 7.35 9.1 11.55 15.4
Rated Capacity(P) 10 15 20 25 30 40 50 60 80 100 120 150 200 250 300 400
Max Capacity(P) 12 17 22 27 33 44 54 64 86 110 130 160 210 260 330 440
Electricity AC380V-50Hz / AC440V-60Hz
Power(kw) 2.25 2.25 2.5 2.5 2.5 3 3 3.5 4 4 4 6 6 7 9 11
External Dimensions                        Lengthwidthheight 1350      1200      1370 1850      1200      1400 1660      1400      1550 1890      1400      1560 1980      1500      1650 2270      1600      1700 2300      1700      1820 2650      1700      1830 2790      1900      2050 2706      2000      2200 3000      2000      2200 3080     2200      2300 3630     2200      2350 3880     2400      2570 4780    2400      2600 5980    2400      2600
Weight Dry weight  (kg) 900 1000 1000 1100 1200 1300 1450 1600 1850 2200 2300 2800 3000 3300 3700 4200

Wet weight  (kg) 1775 2283 2640 2740 3500 4400 5073 5270 6517 8268 9166 11340 13267 16538 20357 25417
Discharge Standard TSS<35mg/L;BOD5<25mg/L;COD<125mg/L;Colichin<100/100ml;PH:6-8.5

Send your message to this supplier

  • Ms. Ala Lee

  • Enter between 20 to 4,000 characters.