
Permanent magnet industrial fan ceiling fan
- Min. Order:
- 1 Set/Sets
- Min. Order:
- 1 Set/Sets
- Transportation:
- Ocean, Land
- Port:
- chongqing, Cuntan
Quantity:
Your message must be between 20 to 2000 characters
Contact NowBasic Info
Basic Info
Place of Origin: | China |
---|---|
Productivity: | 1000 Set/Sets per Month |
Supply Ability: | 1000 Set/Sets per Month |
Payment Type: | T/T |
Incoterm: | FOB |
Transportation: | Ocean,Land |
Port: | chongqing,Cuntan |
Product Description
Product Description
The industrial large ceiling fan looks similar to other traditional ceiling fans, but that doesn't mean that industrial fans are the same as traditional large ceiling fans. In fact, the price difference between industrial large ceiling fans and traditional industrial large ceiling fans is relatively large, not just because their appearance is similar. Large industrial ceiling fans have the characteristics of large air volume, energy saving, and wide coverage, which are popular in many large enterprise workshops. Due to the hot weather, many customers can't wait to install and operate them as soon as possible. What precautions should be taken for the installation of large industrial fans
Industrial large ceiling fans and HVLS fans must have an extremely long service life. After all, they are used in industrial situations, so their working hours are much longer than ordinary electric fans. The components inside and the raw materials used outside directly affect their service life. Another important part is the motor. Ceiling fans used in industrial situations generally have a power of no less than kilowatts, and they should have the advantage of energy conservation, It must meet the five-year quality guarantee for the entire machine.

Basic requirements for installing permanent magnet industrial ceiling fans:
1. Check the shapes and dimensions of components and parts related to assembly, and confirm the list of components and technical instructions before starting assembly
If there is any damage to the surface of the spare parts before assembly, it is necessary to repair or replace them
The installation of industrial fans and permanent magnet direct drive industrial large ceiling fans must meet the drawing requirements
All fasteners of the industrial fan shall not be loose
After the installation of the industrial fan is completed, it is necessary to check whether each accessory is correctly installed according to the technical requirements, and ensure that it is safe before commissioning and operation.
Industrial large ceiling fans and HVLS fans must have an extremely long service life. After all, they are used in industrial situations, so their working hours are much longer than ordinary electric fans. The components inside and the raw materials used outside directly affect their service life. Another important part is the motor. Ceiling fans used in industrial situations generally have a power of no less than kilowatts, and they should have the advantage of energy conservation, It must meet the five-year quality guarantee for the entire machine.

Basic requirements for installing permanent magnet industrial ceiling fans:
1. Check the shapes and dimensions of components and parts related to assembly, and confirm the list of components and technical instructions before starting assembly
If there is any damage to the surface of the spare parts before assembly, it is necessary to repair or replace them
The installation of industrial fans and permanent magnet direct drive industrial large ceiling fans must meet the drawing requirements
All fasteners of the industrial fan shall not be loose
After the installation of the industrial fan is completed, it is necessary to check whether each accessory is correctly installed according to the technical requirements, and ensure that it is safe before commissioning and operation.
Related Keywords
Related Keywords