Chongqing Dike Technology Industry Co. , Ltd.
Chongqing Dike Technology Industry Co. , Ltd.
Isuzu 5m ³ Hook Arm Garbage Truck
  • Isuzu 5m ³ Hook Arm Garbage Truck
  • Isuzu 5m ³ Hook Arm Garbage Truck
  • Isuzu 5m ³ Hook Arm Garbage Truck
  • Isuzu 5m ³ Hook Arm Garbage Truck
  • Isuzu 5m ³ Hook Arm Garbage Truck
  • Isuzu 5m ³ Hook Arm Garbage Truck
Isuzu 5m ³ Hook Arm Garbage Truck
Isuzu 5m ³ Hook Arm Garbage Truck
Isuzu 5m ³ Hook Arm Garbage Truck
Isuzu 5m ³ Hook Arm Garbage Truck
Isuzu 5m ³ Hook Arm Garbage Truck
Isuzu 5m ³ Hook Arm Garbage Truck

Isuzu 5m ³ Hook Arm Garbage Truck

$8340.18 - $27800.60/Vehicle
Min. Order:
1 Vehicle
Min. Order:
1 Vehicle
Transportation:
Contact Us
Quantity:

Your message must be between 20 to 2000 characters

Contact Now
Basic Info
Basic Info
Payment Type: Contact Us
Transportation: Contact Us
Product Description
Product Description
1. It is strictly prohibited for personnel who have not read the instruction manual to operate lifting operations
2. The homework should be carefully observed on the site, and there should be no obstacles within the radius of the swing arm movement.
During lifting, no one is allowed to enter the radius of the swing arm movement.
When the vehicle is parked on a slope greater than 12%, the wheels must be stopped with blocks.
5. The pressure adjustment of the hydraulic system must not exceed the specified value in the manual. After system maintenance, experienced personnel must set it on the hydraulic test bench according to requirements before installation.
6. Only when the supporting legs are confirmed to support the vehicle can heavy lifting operations be carried out, otherwise unpredictable dangers will occur!
7. It is necessary to strictly follow the operating procedures. If any abnormalities are found in the movement of the mechanism during operation, the work should be stopped immediately, the cause should be identified in a timely manner, and the fault should be eliminated before continuing to work.
8. Before homework, observe whether the homework site meets the requirements.
9. After parking, tighten the parking brake and use the hand throttle to control the oil pump speed.
10. According to the signage, first support the support leg oil cylinder on the ground and confirm before operating the swing arm for lifting, dumping, and other operations.
11. After completing the homework, if transporting the material hopper, the following procedures must be confirmed:
a. The hopper chain is in a relaxed state
b. The hopper and swing arm frame are inserted with positioning locking pins
c. The leg cylinder has returned to its original position and the positioning locking pin has been inserted

d. The brake pad under the wheel has been removed


1685870009968275 Jpg1685870008613114 1 Jpg1685870008613114 Jpg1685870008646956 Jpg1685870009331763 1 Jpg1685870009219795 Jpg1685870008896961 Jpg1685870008881524 Jpg1685870008770601 Jpg


Project parameter notes
Vehicle model DKV5070ZXXQ6
Wheelbase (mm 3360
Engine model 4KH1CN6LB
Engine horsepower (ps 120 horsepower
External dimensions [length x width x height (mm)] 5450 * 2000 * 22002300
Curb weight (kg 34903600
Maximum total mass (kg) 7300
Maximum speed (km/h) 95
Front/rear suspension 1015/1075
Approach/departure angle 24/19
Axle load 2580/4720

Send your message to this supplier

  • Mr. Dike Automobile

  • Enter between 20 to 4,000 characters.